• ABOUT
  • WORK
  • FEED
  • CONTACT
Menu

McCLAIN + YU

  • ABOUT
  • WORK
  • FEED
  • CONTACT

In-Progress

•

Office

•

Awards

•

Staff

•

Opening

•

Ground-breaking

•

Collaborators

•

Press

•

Spotlights

•

In-Progress • Office • Awards • Staff • Opening • Ground-breaking • Collaborators • Press • Spotlights • In-Progress • Office • Awards • Staff • Opening • Ground-breaking • Collaborators • Press • Spotlights •

NMT BROWN HALL

August 10, 2023

This project is well on its way to completion. Brown Hall will boast a new board meeting room, and administrative office suite with representational interiors. The back facade and area will become the backdrop to many important exterior events with the beautiful canopy of existing trees.

In In-Progress Tags Renovation, Higher Ed, Admin, NMT, Socorro, Construction
UNM-NM-Mutual-Training-Center-Social-Media-Size-Franken-Use-7.jpg IMG_6645.JPG UNM CT Center 64419db3bfa23.image.jpg UNM-NM-Mutual-Training-Center-Social-Media-Size-Franken-Use-4.jpg UNM-NM-Mutual-Training-Center-Social-Media-Size-Franken-Use-6.jpg

UNM NEW MEXICO MUTUAL CHAMPIONS TRAINING CENTER GRAND OPENING

May 18, 2023

UNM Athletics celebrated the grand opening of the UNM New Mexico Mutual Champions Training Center located on the north side of the school’s Tow Diehm facility. This new training facility for UNM Division 1 and Olympic athletes has a total of 11,312 SF of equipment space, providing athletes with a motivating space to train and challenge their physical health and capabilities. The facility will replace a temporary training facility housed in a large tent near the school’s athletic department offices. The new training center features two levels: a 9,774 SF weight-training floor and a 1,538 SF cardio mezzanine that overlooks the main training space. Just beyond lies an expansive view of the UNM Lobos football field and Sandia Mountains. From its roof, Lobos fans have an elevated patio with unobstructed views of the Lobos games. On game days, the Lobos will enter the field through the ceremonial pathway scribed into the New Mexico Mutual Champions Training Center building, fan spirit mounting with lights and music... Go Lobos!

In Spotlight Tags Opening, New Construction, Higher Ed, Athletics, UNM, Albuquerque

Southeast New Mexico Historical Society

ADMINISTRATION AND EDUCATIONAL SERVICES CENTER (AESC)

April 10, 2023

The Roswell Independent School District (RISD) possesses a historical building that adds much character to the central area of Roswell. It is a 1929 WPA project that forefronts educational buildings of its day. It is listed in the NM State and National Historic Registers. WPA era schoolhouse buildings are important to the foundational municipal identity in western towns with the expansion of western cities. This classic interpretation of then modernized neo-classical building with minor elements of art nouveau details are present in the facade design. The fenestration scheme is double hung windows with mullion details organized in a vertical fashion to highlight the very vertical facade organization, reminiscent of early elegant schoolhouse design. This building first was used as a junior high school, and then converted to an administrative building. The AESC building is 30,000 SF. The building is a three- and one-half story brick with limestone sills and vertical bay structures that are accentuated by the pilaster detail. The local brick and limestone were brought to the site from the emergent industries in building materials. The HVAC system and the interior ceilings are renovated by McCLAIN+YU. An extensive study has been created on how best to utilize this building for future use. The decision of RISD to update and integrate this building will insure this it’s importance in the community.

In Spotlight Tags History, Renovation, Ed, Admin, RISD, Roswell, National Register of Historic Places

UNM NEW MEXICO MUTUAL CHAMPIONS TRAINING CENTER

April 10, 2023

UNM Athletics is active in creating the NEW - New Mexico Mutual Champions Training Center, a 15,000 SQ. FT. facility for the topic of the arts, athletic training for the LOBOS. This building is located inside the university Stadium, beyond the south end-zone. With construction expected to take 10 months for completion, the facility will extend from the Tow Diehm facility, providing space for all UNM Athletic programs, as well as additional spectator seating above. We are excited to see how the LOBOS will use this space and how it will benefit their athletic training! Go LOBOS!

In In-Progress Tags New Construction, Higher Ed, Athletics, UNM, Albuquerque, Construction

UNM WELCOME CENTER

April 10, 2023

Constructed in 1941, this gem on campus was designed by John Gaw Meem. This building initially housed the male dormitory. This soon became extra classrooms, then to transform once again into ROTC building. It will once again be used to house a different use, this time as the official UNM Lobo Welcome Center. The campus has needed a formal campus entrance where new LOBOS can be welcomed with their families. The Welcome Center will host a centralized theater space, presentation and exhibition rooms. There is a formal outdoor patio for functions and gatherings. Parking will be ample. The stories of LOBO nation will be unveiled in the building to all who seek information. The building will embrace its Pueblo Revival tradition with the addition of a modern tectonic approach to renovation and identity for the future LOBO to embrace.

In In-Progress Tags Renovation, Higher Ed, Hospitality, UNM, Albuquerque, Construction

RIO RANCHO HUB

April 10, 2023

Mayor Gregg Hull and District City Councilor Bob Tyler are supporting resolutions to create a new ‘Quality of Life’ center in the Enchanted Hills area of Rio Rancho. This project has since been renamed the HUB @ Enchanted Hills. It is central to an emergent entertainment area of Rio Rancho. We expect many young families to be attracted to Enchanted hills for the library and pickleball courts in this HUB, but also its new breweries and outdoor spaces for families.

It has been 13 years since the city has built a new ‘quality of life’ facility (i.e. public pool, library, or recreation center) - making this development an important feature for the rapidly-growing community of Rio Rancho. Initially constructed as a box commercial space stretching a total of 11,000 SF, the existing property will be renovated, and sub-divided to be used for a new branch library and multi-purpose space for youth and adult recreation programs, community meetings, remote animal adoptions, voting, public-outreach, and many other community-engaging activities.

The brighten interior spaces will be the ‘HUB’ to a lively corner of Enchanted Hills for many of its residents!

In In-Progress Tags Renovation, Hospitality, Community Center, Rio Rancho, Construction

RECENT DESIGN AWARDS

January 5, 2023

McCLAIN + YU is ecstatic to announce that we are the recipients of FOUR awards in 2022 for our Rio Rancho SkyRoom submission - UNM Jeff Harnar Award, AIA Albuquerque Award, AIA New Mexico Award, and the ACSA Faculty Design Award!

The SkyRoom within Rio Rancho’s Campus Park embodies the spirit of New Mexico with its subtle nod to the the Zia symbol and the 4 cardinal points with manipulation of light and shadow. Several other points of influence contributed to the SkyRoom design. First, the project needed to serve as the centerpiece within the newly developed Campus Park - Turfgrass lawn panels now spill out of the main opening of the SkyRoom offering visitors a cool, shady place to enjoy a picnics/concerts/fireworks. Second, we wanted the pavilion to provide a frame for a stone-lined amphitheater and traverse 30 feet of topographical change. Third, the SkyRoom was conceived as a geometrical construct – the result of a subtractive intersection of a large shed roofed structure with two cylindrical volumes.  The cylinders, one small, one large, intersect in the space, creating a surprising, albeit Euclidean ruled surface. Finally, the SkyRoom needed to serve as a performance space with unique acoustics, to create areas with a high degree of focus for sound along with other areas which diffuse sound.

We are excited to share with you some images of our SkyRoom!

In Awards Tags M+Y, Albuquerque, AIA, ACSA

UNMH BEHAVIORAL HEALTH CRISIS CENTER GROUND BREAKING

September 26, 2022

M+Y celebrated the Ground Breaking of the Behavioral Health Crisis Center with UNMH, Bernalillo County, HB Construction, and Governor Michelle Lujan Grisham! Congratulations to all project advocates for moving this important project forward!

In Spotlight Tags Ground Breaking, New Construction, Healthcare, UNMH, Albuquerque, Construction, Bernalillo

UNMH BEHAVIORAL HEALTH CRISIS CENTER

September 16, 2022

Work is now underway on the University of New Mexico North Campus to provide a Behavioral Health Crisis Center (BHCC). M+Y is the lead design firm for the project, consulting with Davis Group. The conception, funding, and management of this facility is part of a collaborative effort between Bernalillo County and UNMH. Located next to the existing University Psychiatric Center at UNM North Campus, the facility will help Bernalillo County and UNMH fulfill their goal of providing compassionate, respectful, and round-the-clock care to serve a vastly underrepresented population in a dignified setting. 

The project’s initial phase calls for the demolition of two existing buildings located at 2600 Marble Avenue, as well as the redevelopment of the northern half of the existing patient parking lot. Phase 2 will encompass construction of the new two-story Behavioral Health Crisis Center and remaining site.

The new Behavioral Health Crisis Center includes three distinct programs that increase critical services — Crisis Triage Center, Psychiatric Emergency Services, and a Peer Living Room—into one building footprint. 

  1. Crisis Triage Center (CTC): New service providing medium-acuity crisis stabilization services offering 16 single-patient bedrooms with private facilities to clients on a voluntary basis for up to 14 days.

  2. Peer-Based “Living Room” (PLR) Model: New service providing low-acuity walk-in and/or referral service in a residential environment accessed by a separate public entrance and lobby to avoid merging lower acuity with higher acuity functions. This program includes a Respite Area, Living Room Space, Nourishment Area and Client Work Rooms.

  3. Psychiatric Emergency Services (PES): Expands the existing program located at the University Psychiatric Center to this new facility to better serve clients who present acute psychiatric care levels and are identified as at risk to self and/or others. The existing program includes ten (10) patient rooms with controlled separation for pediatric and adult census. In addition, there is a separate restraint suite with two rooms near the dedicated vehicular sally port entrance for dedicated intake entrance for first responders.

Special daylighting, circulation, safety, and ligature resistance elements are central to the concept. The project is set to meet LEED Silver certification through material selection, energy/resource conservation, and demolition/construction waste management efforts. 

HB Construction mobilized on site in July, setting up safety perimeter fencing, wayfinding signage, and temporary striping that will allow surrounding facility users to navigate around construction safely. As construction is bordered by over ten occupied medical and research facilities, HB and UNMH have collaborated to establish isolation and public safety measures for each phase of construction.

In Spotlight Tags New Construction, Healthcare, UNMH, Albuquerque, Rendering, Bernalillo

UNM OLYMPIC TRAINING CENTER

September 13, 2022

This project will add 11,337 Gross Square Feet (GSF) of building adjacent to the north wall of the existing Tow Diehm facility on the south end of the University of New Mexico Stadium. The project consists of a single-level, reinforced steel structure to house three main floor areas for various Olympic Sports Training Equipment and activities, including training offices, mechanical, electrical, storage and restroom support areas. An interior Cardio Mezzanine is included within the envelope of the new building. The structure is designed to facilitate the addition of a future roof observation deck, and will connect to the existing exterior stairs on the north east end of the existing Tow Diehm Building.

In In-Progress Tags New Construction, Higher Ed, Admin, NMT, Socorro, Construction

NMT BROWN HALL

September 13, 2022

This project will renovate Brown Hall on the campus New Mexico Institute of Mining Technologies. This building is recognized on the National Register of Historic Places. It is a 3 story; 23,872 square foot building that serves as the main administrative building for New Mexico Tech. The renovation will provide upgraded Electrical, Mechanical, and IT systems, selective interior remodeling, and site upgrades.

In In-Progress Tags Renovation, Higher Ed, Admin, NMT, Socorro, Construction, National Register of Historic Places
McCLAIN + YU

WE'VE MOVED!

October 7, 2021

We are moving! But will still be located in the Southeast Heights of Albuquerque, true to District 6! We are happily located near Sandia National Labs, Kirtland Airforce Base, and the Sunport. We look forward to seeing you in our new location: 2010 Ridgecrest Dr SE Albuquerque, New Mexico 87108.

In Office Tags M+Y, Albuquerque, Construction
MAC SPORTS BAR - EXTERIOR

MAC Sports Bar, Exterior

MCDERMOTT ATHLETIC CENTER

September 29, 2021
MAC SPORTS BAR - INTERIOR

MAC Sports Bar, Interior

The McDermott Athletic Center (MAC) is an addition to its large indoor facilities. This family-oriented outdoor venue is a welcome-addition to the neighborhood where family members of all ages, and their pets, can enjoy the beautiful sunset views. Under a large canopy, multiple large gathering venues can occur during special occasions. These events can spill out into their extensive patio, where this location will be perfect from large sports-viewing, to private functions. Under the canopy, food and drink, and recreational activities are available. This seeks to be a neighborhood spot.

In Spotlight Tags Addition, Hospitality, Community Center, MAC, Rio Rancho, Rendering
SFCC - CAMPUS ENTRANCE

SFCC, Campus Entrance

SANTA FE COMMUNITY COLLEGE

September 29, 2021
SFCC - CAMPUS COURTYARD

SFCC, Campus Courtyard

M+Y with Shepley Bulfinch have completed the master-planning efforts on the campus of Santa Fe Community College, the heart of the technology district. This beautifully sited campus faces many important emergent areas of Santa Fe. Its students draw from the city, the state, and the world. In order to meet the next generation’s educational requirements, SFCC underwent an exhaustive process to capture all salient points of the community, to create an expansive and inclusive document that connects its mission to serve its students.

In Spotlight Tags Master Plan, Higher Ed, SFCC, Santa Fe, Shepley Bulfinch
ROOSEVELT GENERAL HOSPITAL - SITE

Roosevelt General Hospital, Site

ROOSEVELT GENERAL HOSPITAL

September 29, 2021
ROOSEVELT GENERAL HOSPITAL - ENTRANCE

Roosevelt General Hospital, Entrance

Roosevelt General Hospital is critical to addressing regional emergency care. Their leadership, in responding to the growing emergency services to the Southern region of New Mexico, provides much-needed medical attention to all New Mexico citizens. Their addition and renovation will bring confidence to our communities near Portales.

In Spotlight Tags New Construction, Healthcare, RGH, Portales, Rendering
Aerial 1968.jpg
Clark rendering and new wing Page 001.jpg
Clark Hall 1952 Page 002.jpg

UNM CLARK HALL

May 21, 2021

Clark Hall was built in 1951, home to the discipline of Chemistry, on the campus of the University of New Mexico. The office of Meem, Zehner, Holien and Associates created this composed and stately building. The placement and site situation of the building represented a significant development of the growing campus. With its large paned windows and expansive classrooms, tall spaces made in concrete, the students of chemistry were ensured good daylight with lots of fresh air and beautiful views surrounding their building. With time, the studies and research needs of chemistry overwhelm this early building scheme. Therefore, a complete renovation of the interior and redress of the main entry, in keeping with its evolving disciplinary importance on campus, were needed. M+Y embarked on a lively discourse of architectural relevance and importance of representation to places of higher learning and research. We are excited to bring our reverence for the architectural structure and framework of John Gaw Meem instituted into the campus of UNM.

In Spotlight Tags History, Renovation, Lab, UNM, Albuquerque, John Gaw Meem, National Register of Historic Places
IMG_0927.JPG

RIO RANCHO CAMPUS PARK

April 28, 2021

Rio Rancho will soon have a new landmark for the community! Be on the lookout for the new SkyRoom on your Eastward descent into the Sunport or during a scenic balloon ride over the city. We hope it may be visible from the air. We invite you to take a visit once its completed and let us know!

In In-Progress Tags New Construction, Hospitality, Outdoor, Rio Rancho, Construction
IMG_0330.JPG

FCFC PORTALES

April 26, 2021

Construction continues! Here we see a nice open view of the Lobby area. The deep overhang shades the glass in the Summer and allows for passive solar gain in Winter, allowing for a convergence of beautiful and functional design!

In In-Progress Tags New Construction, Hospitality, Worship, Construction
IMG_7827.JPG

ENMU GREYHOUND ARENA

April 21, 2021

Re-roofing of both the ENMU Greyhound arena and main building has now been completed! With its original completion in 1967, the Greyhound Arena has stood the test of time, with major renovations in 1988, 2006, and again in 2012. Considered one of the finest NCAA Division II athletic facilities in the Southwest, the arena is home to the ENMU volleyball, men’s basketball, and women’s basketball teams. More than 4,800 Greyhound Nation fans can watch games in the horseshoe-shaped arena and we’re happy to welcome them back with a newly-renovated roof!

In Spotlight Tags Renovation, Higher Ed, Athletics, ENMU, Portales
The building is looking good! The next step is landscaping.  

The building is looking good! The next step is landscaping.  

DEL NORTE ELEMENTARY SCHOOL

April 5, 2021

Looking forward to Del Norte Dragons in Roswell inhabiting their lair. It is a true excitement to see a school built in the community. It represents all the members of the community believing the children deserve to flourish in a representative architecture that fits their contemporary needs while anticipating their growth for the future! We celebrate ROSWELL, its leaders, its bright children. GO DRAGONS!

In Spotlight Tags New Construction, Ed, DNES, Roswell
← Newer Posts Older Posts →
  • Admin
  • AIA
  • Albuquerque
  • Athletics
  • Bernalillo
  • Construction
  • Data
  • DNES
  • Dorm
  • Ed
  • ENMU
  • Ground Breaking
  • Healthcare
  • Higher Ed
  • History
  • Hospitality
  • John Gaw Meem
  • Lab
  • Learning
  • M+Y
  • Master Plan
  • mPOWER
  • National Register of Historic Places
  • New Construction
  • NMT
  • Opening
  • Pland Collaborative
  • Portales
  • Rendering
  • Renovation
  • Residential
  • Rio Rancho
  • RISD
  • Roswell
  • Socorro
  • SurfaceDesign
  • UNM
  • UNMH
  • Video

McCLAIN + YU Architecture and Design

2010 Ridgecrest Dr SE

Albuquerque, NM 87108

t: 505.266.2142

e: info@mcclain-yu.com